Planning guide

How long does a roof replacement take in Memphis?

The days on the roof, the weeks around them, and what can stretch either one.

By Cora Padgett, Roofing Guides Editor Updated October 2026

We answer 24/7 across Memphis and Shelby County

Quick answer

Most Memphis roof replacements take one to three days of work on the roof itself for a typical house. The weeks around that, for the inspection, written scope, any permit, material delivery and scheduling, usually take longer than the work. Weather, extra layers, damaged decking and approvals are what stretch the timeline.

The usual timeline

StageTypical time
Inspection and photosOne visit
Written scope and decisionA few days, on your schedule
Permit, where requiredVaries by jurisdiction
Material deliveryA few days to a week
Tear-off and installOne to three days for most homes
Cleanup and final walkThe last day of work

The day count on the roof is the part people ask about, but the stretch before it usually takes longer. A replacement is a scheduled job, not an emergency one, and the time between the inspection and the first shingle is where you choose materials, settle on colors and line up any approvals.

Roof replacement in progress with tear-off and new underlayment

What a replacement day looks like

  • Setup. Tarps over landscaping, a dumpster or trailer in the drive, and the crew staged on the roof.
  • Tear-off. Old shingles and underlayment come off one section at a time, down to the decking.
  • Decking. Soft or broken boards are replaced and photographed before anything covers them.
  • Dry-in. Underlayment goes on the same day the old roof comes off, so the house is protected overnight.
  • Install. Flashing, vents, shingles, ridge and edge metal go on.
  • Cleanup. Debris hauled, gutters cleared and a magnet sweep for nails across the yard and drive.

Planning a replacement?

Call and we will inspect, write the scope and give you a realistic schedule before you commit.

Call (901) 459-6395

What stretches the schedule

  • Weather. Rain and storms stop tear-offs. Crews start early in summer to avoid the hottest hours, and a stormy week can push a start date back.
  • Size and pitch. Large or steep roofs take more staging and more days.
  • Extra layers. Two or more old layers mean a longer tear-off and more debris to haul.
  • Decking repairs. Widespread soft decking adds time once the old roof is off.
  • Approvals. HOA design approval or historic-district review has to be in hand before work starts.
  • Material choice. Specialty colors, metal panels or shake products can take longer to arrive.

How to plan around the work

Move cars out of the driveway the night before, take fragile items off shelves on walls that share the roofline, and keep pets and children inside or away during tear-off. Expect noise from early morning until the crew finishes for the day, and plan calls around it if you work from home.

You do not need to be home the whole time, but someone should be reachable by phone in case the crew finds damaged decking and needs a decision.

Storm clouds rolling over suburban rooftops

After the last shingle

We walk the job with you, hand over photos of the decking, underlayment and finished roof, and give you the warranty paperwork. If a permit was involved, the final inspection is part of closing it out.

FAQ

Roof replacement timing questions

Want a real schedule for your roof?

Call (901) 459-6395. We inspect, write the scope and tell you how long your replacement will take.

Reach us

Call any hour, day or night

Phone
(901) 459-6395
Hours
Answering 24 hours a day, 7 days a week
Service office
8235 Memphis Arlington Rd, Memphis, TN 38133
Coverage
Memphis, Shelby County and the close suburbs
Call (901) 459-639524/7